• HEELEY STREET | PADDINGTON | SYDNEY

    Terrace Renovation and Alterations | Construction cost $500k | 8 month construction period

    Architecturally designed alterations and additions. Demolition, addition and total rebuild of original Paddington Terrace with new kitchen, living and bathroom addition. New floors, ceilings, joinery, fixtures and fittings and landscaping.
    Project highlight | Total redesign and tight access.

  • |